Interior Design Checklist: Everything to Do Before, During & After Your Pune Project

Bedroom with a wall-mounted TV unit, fluted panelling and pendant lighting in a Pune home.

You're about to invest ₹15-25 lakhs and 3-4 months into your home's interior design. One forgotten detail, one missed decision, one overlooked step can cost thousands and weeks of delay.

After managing 450+ projects at Divya Jain Interiors, we've created this comprehensive checklist, everything you need to do before hiring a designer, during execution, and after project completion.

Bookmark this page. You'll reference it dozens of times over the next few months.


PHASE 1: Before Starting (2-3 Months Before)

Financial Planning

Determine total budget

●     Include 10-15% contingency (unexpected costs always arise)

●     Factor in: Interior + Civil work + Appliances + Contingency

●     See realistic budgeting in our 3BHK cost guide

Understand financing options

●     Home improvement loan? (12-14% interest typically)

●     Personal loan?

●     Savings?

●     Mix of above?

Create budget allocation

●     Kitchen: 20-25% of interior budget

●     Master bedroom: 15-20%

●     Living areas: 15-20%

●     Other bedrooms: 15-20%

●     Bathrooms & doors: 10-15%

●     Electrical & false ceiling: 10-15%

Confirm payment capacity

●     Can you make staged payments? (typically 5 stages)

●     Initial deposit ready? (usually 10-15% to start design)


Timeline Planning

Decide project start date

●     Avoid starting during: Diwali (Oct-Nov), major festivals

●     Best months in Pune: Jan-May, Sep-Dec

●     Consider: When can you vacate? When do you need to move in?

Plan accommodation

●     Full interior: Must vacate completely (60-90 days)

●     Renovation: May live in apartment (some areas at a time)

●     Where will you stay? (rental, family, hotel?)

Calculate total timeline

●     Design finalization: 4-6 weeks

●     Material procurement: 2-3 weeks

●     Execution: 60-90 days (3BHK turnkey)

●     Buffer: Add 2-3 weeks for unforeseen delays

●     Total: 4-5 months from first meeting to move-in

See detailed timeline in our week-by-week process guide.


Research & Planning

Collect inspiration

●     Pinterest boards (create separate boards: Kitchen, Bedrooms, Living, etc.)

●     Instagram saves

●     Magazine clippings

●     Photos from friends' homes

●     Note what you DON'T like (equally important)

Understand your home

●     Get architectural drawing (floor plan with dimensions)

●     Note: Load-bearing walls (can't remove)

●     Identify: Wet areas, electrical panel location, water supply points

●     Check: Society rules and restrictions

List functional requirements

●     How many people's clothes in each wardrobe?

●     Kitchen: How many utensils, appliances, groceries to store?

●     Work from home? Need dedicated office?

●     Exercise at home? Need space for equipment?

●     Hobbies requiring space? (music, art, reading)

Decide on service model

●     Design Only? Design + Supervision? Turnkey?

●     See comparison in our service models guide


Designer Selection

Shortlist 3-5 designers

●     Local Pune designers (understand monsoon, local challenges)

●     Check Google reviews (minimum 20+ reviews, 4+ rating)

●     View Instagram/website portfolio

●     Verify: Years in business, number of projects completed

Schedule consultations

●     Meet at their office/studio (see their setup)

●     Ask to visit 1-2 completed projects (essential)

●     Bring: Floor plan, inspiration images, budget range

Questions to ask each designer

●     How many Pune projects completed?

●     Can we visit completed projects? (Red flag if no)

●     What's your typical timeline? (accountability)

●     Payment schedule? (tied to milestones)

●     Warranty terms? (2 years workmanship minimum)

●     What happens if you delay? (penalty clause?)

●     Itemized quote or lump sum? (itemized better)

Compare quotes properly

●     Don't just look at total price

●     Compare: Plywood grade, hardware brand, warranty terms

●     What's included vs excluded?

●     See common mistakes in our mistakes guide


Legal & Documentation

Review apartment documents

●     Ownership papers (clear title?)

●     Society rules (work timings, permissions needed?)

●     Building age and condition

●     Any pending society dues?

Check society requirements

●     Work hours allowed? (typically 9 AM - 6 PM)

●     Sundays allowed?

●     Deposit required? (₹5,000-15,000 typical, refundable)

●     Permissions needed for structural work?

Verify contractor requirements

●     Police verification needed for workers?

●     Insurance requirements?

●     Safety deposit?


PHASE 2: Design Development (4-6 Weeks)

Initial Stage

Finalize designer and sign contract

●     Review contract thoroughly (take 48 hours)

●     Clarify: Scope, timeline, payment, warranties

●     Get everything in writing

Pay initial deposit

●     Typically 10-15% to start design work

●     Get proper receipt with GST

Schedule site measurement

●     Be present during measurement (point out specifics)

●     Discuss: Problem areas, structural issues, concerns

Share detailed requirements

●     Every bedroom: Whose room, storage needs, work area needed?

●     Kitchen: Cooking style, appliances owned, family size

●     Living areas: Entertaining frequency, TV size, storage needs

●     Bathrooms: Tub or shower? Storage requirements?


Design Review Stage

Review 2D layouts (multiple options)

●     Does furniture placement feel right?

●     Is circulation smooth? (3 feet minimum walkways)

●     Are doors obstructed?

●     Power points conveniently located?

Mark furniture positions physically

●     Use tape on apartment floor

●     Sit in rooms, walk through

●     Visualize daily life

●     Adjust before finalizing

Review 3D visualizations

●     Do colors work together?

●     Is lighting adequate?

●     Does aesthetic match your vision?

●     Will this look good in 5 years? (avoid trendy over timeless)

Approve technical drawings

●     Carpentry drawings (dimensions, materials specified)

●     Electrical layout (point locations, switch positions)

●     Plumbing layout (kitchen, bathrooms)

●     False ceiling plan (lighting positions)


Material Selection

Visit showrooms with designer

●     See physical samples (colors look different than screens)

●     Touch materials (laminate textures, hardware weight)

●     Operate hardware (soft-close feel, drawer smoothness)

Finalize all materials

●     Plywood grade (BWR 710 minimum for Pune)

●     Laminate/veneer selections (with codes)

●     Hardware brand and finishes

●     Countertop material and color

●     Paint colors (in daylight and artificial light)

●     Flooring (if changing)

●     See material considerations in our monsoon-proof guide

Get final itemized quote

●     Every item listed with specifications

●     Material grades mentioned

●     Brand names specified

●     Warranties stated

●     Payment schedule clear

Approve and sign off

●     This is the point of no return

●     Changes after this = additional costs

●     Take time, be 100% sure


PHASE 3: Pre-Execution (2-3 Weeks)

Administrative Tasks

Complete all payments as per schedule

●     First milestone (typically after design approval)

●     Keep receipts organized

Obtain society permissions

●     Submit required documents

●     Pay society deposit if needed

●     Get written approval for work

Arrange temporary accommodation

●     If vacating: Book 3 months minimum

●     Keep some overlap (projects can extend)

Set up communication channels

●     WhatsApp group with designer/project manager

●     Schedule: Weekly calls (day/time fixed)

●     Emergency contact numbers


Site Preparation

Clear apartment completely

●     Remove all furniture (if fresh interior)

●     Store items safely

●     Remove curtains, wall decor, everything

Disconnect services temporarily

●     Gas connection (if kitchen relocation)

●     Internet/cable (if point changes)

●     Keep electricity and water on

Protect existing fixtures

●     Items not being replaced (tiles, fixtures)

●     Windows and doors

●     Bathroom fittings staying

Provide site access

●     Duplicate keys to contractor

●     Society gate pass arranged

●     Access timings coordinated


PHASE 4: During Execution (60-90 Days)

Weekly Tasks

Attend weekly progress calls (15 minutes)

●     What was completed this week?

●     What's planned for next week?

●     Any issues or delays?

●     Any decisions needed from you?

Review photo updates

●     Daily photos via WhatsApp (good designers send these)

●     Compare against timeline

●     Note any concerns early

Schedule site visits

●     Week 4: Mid-carpentry stage

●     Week 8: Before painting begins

●     Week 11: Pre-final inspection

●     More if you're in Pune and available


Decision Points

Material arrivals

●     Inspect quality when delivered

●     Match against specifications

●     Verify quantities

Work stage approvals

●     Carpentry framework (before shutters)

●     Electrical rough-in (before plastering)

●     Paint primer (before final coats)

●     Hardware installation (before final fixing)

Change requests

●     Avoid mid-execution changes (costly)

●     If absolutely necessary: Get written quote first

●     Document reason (learning for future)


Payment Milestones

Stage payments as per contract

●     Typically: Material delivery (50%), Hardware & finish (35%), Paint (10%), Final (5%)

●     Only pay after verifying work completion

●     Keep 5-10% for final handover

Keep payment records

●     All receipts and invoices

●     Track against contract

●     Note any additional charges


Quality Checks

Monitor key quality points

●     Plywood edges sealed (moisture protection)

●     Hardware operating smoothly

●     Paint finish even and smooth

●     Shutters aligned properly

●     No visible screws or joints

●     Drawers sliding smoothly

Document issues immediately

●     Photos of problems

●     WhatsApp to project manager

●     Note date and location

●     Track resolution


PHASE 5: Completion (Week 12-13)

Pre-Final Inspection

Room-by-room walkthrough

●     Test every drawer, shutter, door

●     Check all electrical points

●     Operate all hardware

●     Look for scratches, dents, misalignment

●     Note: Even minor issues (they'll compound)

Create punch list

●     Document everything needing fix/adjustment

●     Photos of each issue

●     Give timeline for fixes (48-72 hours typical)

Verify against contract

●     Is everything delivered as promised?

●     Any missing items?

●     Material grades correct?


Final Handover

Final walkthrough after fixes

●     Verify punch list items completed

●     Check cleaning done thoroughly

●     Everything functioning?

Collect documentation

●     Material warranties (plywood, hardware)

●     Appliance manuals and warranties

●     Paint color codes (for future touch-ups)

●     Vendor contact list (for future purchases)

●     Maintenance instructions

●     Workmanship warranty certificate

Make final payment

●     Only after 100% satisfaction

●     Get proper paid invoice

●     Get warranty certificate

Take handover photos/videos

●     Document condition at handover

●     Useful for warranty claims later

●     Before-after comparison for social media!


PHASE 6: Post-Handover (First 30 Days)

Immediate Actions

Deep clean again (your standards)

●     Construction dust settles for 2-3 days

●     Clean all wardrobes inside

●     Wipe all surfaces

Install remaining items

●     Curtains and blinds

●     Light fixtures (if not done)

●     Decorative items

●     Plants and accessories

Arrange furniture and decor

●     Move in gradually (not all at once)

●     Live in space before buying more furniture

●     See what's actually needed vs planned


First Week

Test everything daily

●     Open every drawer multiple times

●     Operate all shutters

●     Use kitchen extensively

●     Check for any issues

Note any problems

●     Sticky drawers

●     Misaligned shutters

●     Paint touch-ups needed

●     Hardware adjustments

Report issues immediately

●     Within first week = easy fixes

●     After 30 days = may fall outside warranty


First Month

Schedule day 7, 15, and 30 check-ins

●     Good designers do this automatically

●     Discuss any issues observed

●     Get maintenance tips

Conduct post-monsoon check (if applicable)

●     Any moisture issues?

●     Wood swelling?

●     Mold or odors?

●     Address immediately

Leave online review

●     If satisfied: Help others find good designer

●     If issues: Give designer chance to fix first

●     Fair, honest review helps everyone


PHASE 7: Long-Term (Years 1-2)

Maintenance Checklist

Monthly

●     Wipe down kitchen cabinets (prevent buildup)

●     Clean hardware with dry cloth

●     Check for loose screws/fittings

Every 6 Months

●     Deep clean all wardrobes (empty and wipe)

●     Check hinges and channels (lubricate if needed)

●     Touch up paint scratches

●     Check silicon sealing (kitchen, bathrooms)

Yearly

●     Professional anti-fungal treatment (₹3,000-5,000)

●     Silicon re-sealing where needed

●     Hardware servicing (if operating roughly)

●     Paint touch-ups (high-traffic areas)

After Each Monsoon

●     Inspect all woodwork near external walls

●     Check for moisture damage early

●     Address issues before they spread

●     See prevention tips in our monsoon guide


Warranty Management

Keep warranty documents organized

●     Workmanship: 2 years (typically)

●     Plywood: 5-20 years (depending on grade)

●     Hardware: 10-25 years (depending on brand)

●     Paint: 5-7 years (manufacturer warranty)

Document any issues

●     Photos with dates

●     Description of problem

●     When it started

Contact designer for warranty claims

●     Within warranty period

●     Provide documentation

●     Give reasonable time to address

Annual maintenance visit (if offered)

●     Some designers include one annual visit

●     Inspection and minor adjustments

●     Builds long-term relationship


Special Considerations for Pune

Monsoon-Specific Checklist

Before monsoon (May-June)

●     Check all window seals

●     Ensure exhaust fans working

●     Apply furniture wax/polish

●     Use silica gel packets in wardrobes

During monsoon (June-September)

●     Run exhaust fans daily (even if not showering)

●     Open wardrobes weekly for ventilation

●     Wipe kitchen surfaces daily

●     Check for black spots (early mold signs)

Post-monsoon (October)

●     Deep clean everything

●     Inspect for any damage

●     Air out all enclosed spaces

●     Address issues before they worsen


Society-Specific Checklist

Before starting work

●     Verify work timings allowed

●     Confirm material delivery logistics

●     Arrange parking for contractor vehicles

●     Inform neighbors (courtesy)

During work

●     Stick to allowed timings

●     Minimize common area disruption

●     Clean up daily

●     Address neighbor complaints promptly

After completion

●     Clean common areas used

●     Collect society deposit back

●     Get No Objection Certificate (if required)

●     Thank society office and security


Red Flags During Process

🚩 Stop and address if you notice:

●     Designer not responding to calls/messages (2+ days)

●     Work quality suddenly declining

●     Materials different from approved samples

●     Timeline slipping with no explanation

●     Hidden costs appearing

●     Contractor behavior unprofessional

●     Safety issues at site

Action: Document issue, escalate to senior management, withhold payment if needed.


Your Master Checklist Summary

Before Starting (2-3 months):

●     Budget and financing sorted

●     Timeline planned

●     Designer selected and contracted

●     Materials and designs finalized

During Execution (60-90 days):

●     Weekly check-ins done

●     Quality monitored

●     Payments on schedule

●     Issues addressed promptly

After Completion (30+ days):

●     Thorough inspection done

●     Documentation collected

●     Issues within warranty reported

●     Regular maintenance followed

Print this checklist. Keep in project folder. Check off as you go.


Ready to Start Your Project Right?

This checklist represents 450+ projects worth of learning. Everything we wish every client knew before starting.

Have it with you during your consultation, and we'll walk through it together.

Schedule Your Free Consultation:

📞 Call: +91-8390707573 / +91-8959070757

💬 WhatsApp: Click to message

🌐 Visit: www.divyajaininteriors.com

During consultation:

●     We'll review this checklist together

●     Customize it for your specific project

●     Identify any additional steps for your situation

●     Give you a project timeline with milestone dates

●     Provide realistic budget and expectations

Preparation prevents problems. Let's get it right from day one.


Related Reading

🔗 Our Complete Process

🔗 Complete3BHK Cost Guide

🔗 Top Design Mistakes to Avoid


Planning your interior project? Print this checklist or bookmark this page. You'll reference it dozens of times. Questions? WhatsApp us, we respond within 2 hours during business hours.

Want a number for your home?
Get an indicative range in under a minute.
Open the calculator →